The Plant · Ilam, Koshi Province

Upper Puwa-I Small Hydropower Project

A 3 MW run-of-river plant fed by two streams of the Puwa Khola in Ilam District, generating since January 2015.

Design discharge
2.31 m³/s at 40% exceedance
Installed capacity
3 MW
Gross head
159 m
Design annual energy
17.40 GWh

How It Works

Two Streams, One Powerhouse

Water from the Thulo Puwa Khola and the Sano Puwa Khola is cleaned at each intake, carried in buried canals to a shared forebay, and dropped through the penstock to the powerhouse before it returns to the river.

  1. 1

    Thulo Puwa Intake

    Side intake · 2 openings, 2 m × 0.6 m

    Takes water from the Thulo Puwa Khola. A gravel trap and a 27.5 m desander remove stones and sand.

    See component
  2. 2

    Sano Puwa Intake

    Tyrolean weir · 9 m × 1.2 m

    A bottom-grill intake on the Sano Puwa Khola, followed by its own gravel trap and a 24 m desander.

    See component
  3. 3

    Buried Canals

    2,133 m and 1,612 m

    Two covered concrete canals, laid under the access road, carry 1.36 m³/s and 1.005 m³/s to the forebay.

    See component
  4. 4

    Common Forebay

    15 m × 5.5 m × 3.34 m

    Both canals meet here. A spillway and flushing gates hold the level steady before the water enters the penstock.

    See component
  5. 5

    Penstock

    460 m · Ø 1.1 m steel

    A steel pipe with 8–16 mm walls, held by 82 saddle supports and 10 anchor blocks, drops the water to the powerhouse.

    See component
  6. 6

    Powerhouse

    2 Francis units · 1,000 rpm

    A 336 m² surface building with two horizontal Francis turbines, two 1,875 kVA generators and the control room.

    See component
  7. 7

    Tailrace

    2 m × 1 m box culvert

    Returns the water to the Thulo Puwa Khola below the powerhouse.

    See component
  8. 8

    Switchyard

    Generation at 6.6 kV

    Connects the plant to the national grid.

    See component

Salient Features

Technical Specifications

Location & Type

District
Ilam, Koshi Province
Coordinates
26°59′20″–27°01′00″ N, 87°52′36″–87°54′25″ E
Type
Run-of-river
Water sources
Thulo Puwa Khola and Sano Puwa Khola
In operation since
15 January 2015

Hydrology

Catchment area
30.9 km² (Thulo Puwa) + 22.3 km² (Sano Puwa)
Design discharge
2.31 m³/s at 40% exceedance

Headworks

Thulo Puwa intake
Side intake, 2 openings of 2 m × 0.6 m
Thulo Puwa desander
27.5 m × 4.5 m × 2.3 m, 1.50 m³/s
Sano Puwa intake
Tyrolean weir, 9 m × 1.2 m, bed slope 1:33
Sano Puwa desander
24 m × 3.5 m × 2.0 m, 1.10 m³/s

Waterways

Thulo Puwa canal
Buried, 2,133 m, 1.36 m³/s
Sano Puwa canal
Buried, 1,612 m, 1.005 m³/s
Forebay
15 m × 5.5 m × 3.34 m, 2.365 m³/s
Penstock
Steel, Ø 1.1 m, 460 m, 8–16 mm thick
Tailrace
Box culvert 2 m × 1 m, slope 1:100

Powerhouse & Grid

Installed capacity
3 MW
Gross head
159 m
Turbines
2 horizontal Francis units, 1,000 rpm
Generators
2 × 1,875 kVA synchronous, 6.6 kV, 50 Hz
Powerhouse
Surface, 336 m², 9.6 m high
Tailwater level
1,231.5 m

Energy

Design annual energy
17.40 GWh
Dry / wet season
2.64 GWh / 14.76 GWh

Key Facts

Licences and Power Sales

Company

Incorporated
19 April 2005
Public limited company
6 February 2015
Commercial operation
15 January 2015
Stock exchange
NEPSE, symbol JOSHI

Power Purchase Agreement

Buyer
Nepal Electricity Authority
Signed / amended
6 May 2009 (985 kW) / 2 August 2011 (3 MW)
Term
30 years
Contracted plant load factor
65.42%

Tariff

First 985 kW
Rs 4.00 wet / Rs 7.00 dry per kWh
Remaining 2,015 kW
Rs 4.80 wet / Rs 8.40 dry per kWh
Escalation
3% a year on the base tariff for 9 and 5 years respectively

Powering Nepal's Progress, Sustainably