NEPSEListed on the Nepal Stock Exchange
Three Megawatts from the Hills of Ilam
Joshi Hydropower Development Company owns and runs the 3 MW Upper Puwa-I plant on the Puwa Khola, which has supplied the national grid since January 2015.
NEPSE symbolJOSHI
- Installed capacity
- 3MW
- Design energy a year
- 17.4GWh
- Generating since
- 2015
- Listed shares
- 6,128,100
Rights shares (1:0.65) allotted in September 2025 · paid-up capital now Rs 612.81 million
Investor RelationsJoshi Hydropower Development Company Limited was incorporated in April 2005 and has run the Upper Puwa-I Small Hydropower Project in Ilam District since 15 January 2015. The plant takes water from two streams, the Thulo Puwa Khola and the Sano Puwa Khola, carries it through buried canals to a shared forebay, and drops it through a 460 m penstock to two Francis turbines. Its full output is sold to the Nepal Electricity Authority. The company’s shares trade on the Nepal Stock Exchange under the symbol JOSHI.
- Generating since January 2015
- Output sold to NEA under a 30-year PPA
- Shares listed on NEPSE as JOSHI
Leadership
Board and Management
The directors elected by shareholders, and the management team who run the company day to day.
Board of Directors
-

Dipak Prasad Kushuwa
Chairman
-

Kalpana Sharma
Director
-

Nibesh Thapa Magar
Director
Management
-

Sudhir Lamichhane
Chief Executive Officer
-

Sharada Ghale
Company Secretary
At the Plant
Inside Upper Puwa-I
-
Generating units
-
Headrace canal
-
Control room
-
Switchyard
Why Upper Puwa-I
A Working Plant on a Small River
Upper Puwa-I is a run-of-river plant: it uses the Puwa Khola’s flow as it comes, with no reservoir. Output is highest in the monsoon and lowest in late winter, and every unit is sold to the national utility.
-
Running Since 2015
Upper Puwa-I has fed Nepal’s grid since 15 January 2015, making JHDC one of the older listed small-hydro operators.
-
A Contracted Buyer
The Nepal Electricity Authority buys all the power the plant produces, under an agreement that runs for 30 years.
-
Two Water Sources
Separate intakes on the Thulo Puwa and Sano Puwa streams feed one forebay, so the plant is not tied to a single stream.
-
Local Jobs and Roads
People from the project area get first priority for jobs at the plant, and the company keeps the site road in repair for local use.
- 159m
- Gross head
- 2.31m³/s
- Design discharge
- 2
- Francis turbine units
- 53.2km²
- Combined catchment
The Plant
Component by Component
-
01Headworks
Two intakes feed the plant. On the Thulo Puwa Khola, a side intake with a gravel trap (8 m × 2.7 m) and a 27.5 m desander handles 1.50 m³/s. On the Sano Puwa Khola, a 9 m Tyrolean weir with its own gravel trap and a 24 m desander handles 1.10 m³/s.
Read more -
02Water Conveyance
Two buried concrete canals, 2,133 m and 1,612 m long, run under the access road to a shared forebay (15 m × 5.5 m × 3.34 m) with spillway and flushing gates. From there a 460 m steel penstock, 1.1 m in diameter, drops to the powerhouse on 82 saddle supports and 10 anchor blocks.
Read more -
03Powerhouse
A surface building of 336 m², 9.6 m high, housing the turbines and generators, the control room, the machine hall and drainage systems.
Read more -
04Generating Units
Two horizontal-axis Francis turbines rated at 1,000 rpm drive two 1,875 kVA synchronous generators at 6.6 kV and 50 Hz.
Read more -
05Control Room
Operators run and monitor the units, the gates and the grid connection from the control room inside the powerhouse.
Read more -
06Tailrace
A 2 m wide, 1 m high box culvert on a 1:100 slope returns the water to the Thulo Puwa Khola. Tail water level is 1,231.5 m, and the 100-year flood level 1,232 m.
Read more -
07Switchyard
Switchgear and transformers connect the generating units to the national grid.
Read more
Contact
Talk to Us
Questions about the plant, your shares or a notice? Use the form or call our office in Kalopul, Kathmandu, Sunday to Friday.
- Phone Number+977-1-4562844
- Email Addressjoshihydropowerdev@gmail.com